Containerised Boilerplant

Client: Chemical Production Company in Derbyshire

Job: Design and Install 500 Lbs/Hr Skid Mounted Steam Boilerplant

Scope of Work

Using a 20ft shipping container we were asked to produce a containerised steam boilerplant capable of producing 2000lbs/hr. We began by laying out the electrics within the container. We then:

  • Totally re-conditioned a 2000 lbs/hr Wellman Robey Steam Boiler
  • Supplied a re-conditioned blowdown receiver
  • Manufactured a new hotwell tank and steel support stand.
  • Manufactured steam distribution manifold
  • Carried out pipework installation in an extremely neat fashion.
  • Delivered to site and connected up to existing steam system.