Case Studies

Client: Moorhouses Brewery, Burnley

Job: Design of New Boilerhouse within New Brewhouse Development

Scope of Work

McEwen Boilermakers have worked for Moorhouses Brewery for over 20 years. The original steam boilerplant was installed by us, so when the decision was made to build a new much larger brewery, we were contacted and began to design the new plant. We began by liaising with the architect, and transferred the building layout onto our CAD program, where we were able to site the boiler, hotwell and blowdown receiver, as well as show interconnecting pipework, chimneys etc. We also were able to provide civil drawing for concrete shuttering for drains and pipework ducts, resulting in a very neat and tidy installation.