Client: Bio Fuel Development Plant, North Devon
Job: Installation of Steam and Condensate Pipework
Scope of Work
The company was contracted to carry out the manufacture and installation of a new main steam supply into the fuel development building. Two steam manifolds were designed and installed along with the supply of isolating steam valves, steam traps, interconnecting steam and condensate pipework. Our team of engineers pre-fabricated the manifolds and sections of pipework, and carried out a full on-site installation service. On completion of the pipework manufacture, it was lagged in foil back insulation.