The
Book 'Chronicles of a Lancastrian Boilermaker'
Gallery View some of Alan's collection of historic photographs
designed and maintained
by
Industrial Boilerplant
Engineers
Manufacture
Of A Plinth Mounted Packaged, 1,000Lbs/Hr, Gas Fired Steam
Boilerplant For A Food Processing Plant.
Fully
packaged Boiler-plant is loaded onto transport at
our Farling Top Works. The package comprises of a
fully re-furbished 1000Lbs Hour steam boiler, a brand
new blow-down receiver and hotwell tank and all connecting
pipework and fittings.
Installation
on site. The plinth is skated into position reducing
the workload on site dramatically. Here Mick White and
Alasdair McEwen are carrying out the installation accompanied
by Andy (Electrical Engineer).